DryTrans digital transformer monitoring workspace
HomeClient Workspace

Client Workspace

Your transformer moisture management data. Anytime. Anywhere.

Secure access to your transformer data, reports, trends, and engineering insights — all in one place.

  • Secure & Confidential
    Enterprise-grade security to protect your critical data.
  • 24/7 Access
    Access your data and reports anytime, from anywhere.
  • Actionable Insights
    Turn data into insights and better decisions.
  • Expert Support
    Connect with DryTrans engineering team.
Module 01
Engineering Tools

Powerful tools to analyze moisture & support maintenance decisions.

A precision-calibrated suite of diagnostic and simulation modules — built for the engineers running mission-critical transformer fleets.

Transformer Moisture Assessment Tool
Moisture in Paper Estimation
%RS / ppm Interpretation
Water Removal Estimation
Media Capacity & Life Estimation
DryTrans Performance Calculator
Moisture Assessment Tool
Engineering Tool
Transformer Information
40
22000
45
Measured Moisture (ppm): 25
Moisture Condition
18%%RS at 45°C
Good
Module 02
Model Selection

Select the most suitable model with technical & financial justification.

Match the right DryTrans unit to your transformer profile and quantify payback before you commit capital.

Right model recommendation
Estimated drying performance
Investment payback estimation
Technical justification summary
Start Model Selection
Recommended DryTrans Solution
Match · 98%
DryTrans TR50-B unit
Recommended Model
TR50-B
  • Oil Vol · 22,000 L
  • Moisture · 18% RS @ 45°C
  • Dry Time · 60 – 90 days
  • Media · ~ 5 years
Investment Justification
  • Reduce failure risk
  • Extend transformer life
  • Lower maintenance cost
  • Improve availability
Estimated Payback
8 – 14 months
Module 03
MMS90 / TRAM90 Telemetry

Stream PLC data into auto-generated dashboards.

Real-time telemetry from your DryTrans system — moisture, %RS, temperature, alarms, run hours — turned into actionable insight.

Inlet / Outlet Moisture (ppm)
%RS & Temperature Trends
Flow, Operating Hours & Alarms
Performance Dashboard
Media Life Indication
Downloadable Reports
MMS90 Performance Dashboard
27 May 2025 · 10:30
Inlet
16.5 ppm
Outlet
10.8 ppm
%RS @ 45°C
13.2 %
Oil Temp
45.0 °C
Moisture Trend (ppm)
Media Life
72%
Status
Normal
Run Hours
1,240 hrs
Module 04
Expert Assessment

Upload your oil test data — get a detailed expert report.

Human-in-the-loop validation by senior DryTrans engineers. We review your DGA, Furans and operating data and respond with a written assessment.

Moisture & Paper Moisture Estimation
Insulation Health Interpretation
Risk Assessment & Recommendations
Detailed Expert Report
Corrective Action Guidance
DryTrans Suitability Review
Assessment Pipeline
3 stages
Stage 01
Upload Data
Oil test reports, DGA, Furans, operating data.
Stage 02
Expert Review
Senior engineers analyze your data.
Stage 03
Detailed Report
Recommendations & corrective actions.
Typical Turnaround
5 – 7 business days · Confidential
Module 05
Specialist Services

Engineering services to extend your transformer life.

A network of senior engineers on-call for evaluation, risk assessment and long-horizon planning of your asset fleet.

Svc · 01
Transformer moisture assessment and interpretation
Deep moisture analysis
Svc · 02
Insulation health evaluation
Condition assessment
Svc · 03
Remaining life assessment
Longevity forecasting
Svc · 04
Comprehensive transformer condition assessment
Full health check
Svc · 05
Asset risk evaluation and maintenance planning
Risk mitigation
Svc · 06
Technical reviews of transformer test data
Expert review
DryTrans AI
Online · Neural Link Active

Hello and Welcome to DryTrans. How can I help you today?